Dortmund

Revitalisation of Knepper power plant

Jul 2022
Projekt start
600.00 M2 Plot size
98.00 % Recycled material

Project description

Play video

In 2017, Uniper, a subsidiary of EON, put the 59-hectare brownfield power plant site with 750,000 cubic metres of enclosed space out to national tender. The Hagedorn Group was awarded the contract for the strategically located site on the A2/A42/A45 motorways. Two cities and two district governments are involved in the inter-municipal project. The revitalisation process is scheduled to take two to three years.

Play video

During this time, the entire Hagedorn process chain will be utilised: demolition, dismantling, remediation of contaminated sites and civil engineering as well as the development of a sensible subsequent use concept for commercial and logistics purposes. Interested project development companies are expected to be able to build on the sites offered with building rights in 2020.

WHAT WAS DONE

  • Demolition work
  • Pollutant clean-up
  • Welding work
  • Blasting of boiler house, cooling tower and chimney
  • Civil engineering work
  • Site preparation for the industrial and logistics park

DURATION

  • Start: January 2018

 

PLOT SIZE

  • 580,000 m2

Machines used

Hitachi ZX490

CAT 330

CAT 390