WHAT WAS DONE
Demolition and pollutant clean-up
- Implementation concept
- Remediation concept
- Environmental / occupational safety concept
- Disposal/recycling concept
- Conventional demolition
- Complete demolition
- Industrial buildings
- Industrial demolition
- Deep demolition
- Remediation of construction waste
Disposal and material flow management
- Building material recycling
- Material flow and waste management
- Building rubble
- Road demolition waste
- Construction site waste
- Waste from construction and renovation measures
- Production of recycled, secondary and substitute building materials
- Construction site disposal
- Separation
- Reinstallation
- Processing and utilisation of bulk debris
DAUER
- Start: November 2020
- End: end of 2021
USE OF MACHINES
- CAT Kettenbagger 336-07A
- CAT Kettenbagger 330-07A
- CAT Kettenbagger 336 FLN
- Hitachi Kettenbagger KMC 600 LF
PLOT SIZE
- 100.000 m2
CONVERTED SPACE
- 280.000 m3
The colleagues demolishing the old EDEKA Minden-Hannover central warehouse got to work with eight excavators at the same time. Two tractors and a wheel loader were at the start. 280,000 square metres of enclosed space had to be removed. In addition to the time pressure, the complex material flow management was a challenge. For example, a lot of polystyrene was used in the floors, ceilings and cold stores. And the colleagues had to deal with weakly bound asbestos-based levelling compounds during the pre-core removal. They also removed 7,000 square metres of wall and ceiling sheeting containing PCBs. After sorting, the rubble was crushed into recycled material and reinstalled on the construction site - as a solid foundation for the new EDEKA Minden-Hannover headquarters, which will be built here by 2024.
Do you have a question?
Feel free to contact us

Zentrale Gütersloh
Zentrale Gütersloh
Werner-von-Siemens-Straße 18 33334 Gütersloh